# ThermIQ — Schaltschrank (Electrical Cabinet) ASP1 Adrian is responsible for the Schaltschrank design and build. This document tracks decisions, component list, wiring notes, and open items. ## Cabinet Designation: ASP1 First installation: Walda, Germany. ## AC Power Distribution ``` Grid 230V/400V └── Q0: FI/LS (RCD + MCB) — main protection └── 230 V AC busbar ├── LS Miner 1 → K10 (contactor) → Miner 1 (2x Schuko) ├── LS Miner 2 → K11 (contactor) → Miner 2 (2x Schuko) ├── LS Pumpen → P3, P4, P5 (Wilo Stratos PICO plus) ├── LS Ventile → Relay block K3-K6 → RV1, RV2 (Belimo CQ230A) ├── LS RK → K2 → Rückkühler fan └── LS PSU → 24 V DC PSU ``` ## 24 V DC Distribution ``` 24 V DC PSU ├── RevolutionPi (Core + DIO + AIO) ├── Safety relay (coil supply + input circuit) ├── Relay coils: K2, K3, K4, K5, K6, K7 └── Fuses per branch ``` ## Relay / Contactor Summary | ID | Type | Coil | Load | Function | |----|------|------|------|----------| | K2 | Relay | 24 V DC | 230 V AC | Rückkühler fan | | K3 | Relay | 24 V DC | 230 V AC | RV1 AUF | | K4 | Relay | 24 V DC | 230 V AC | RV1 ZU | | K5 | Relay | 24 V DC | 230 V AC | RV2 AUF | | K6 | Relay | 24 V DC | 230 V AC | RV2 ZU | | K7 | Relay | 24 V DC | potential-free | Heat pump EVU I1 | | K10 | Contactor | safety output | 230 V AC | Miner 1 power | | K11 | Contactor | safety output | 230 V AC | Miner 2 power | ## RevolutionPi I/O Mapping ### Digital Outputs (DO) | DO | Function | Load | |----|----------|------| | DO_K2 | Rückkühler fan relay | K2 coil | | DO_K3 | RV1 AUF | K3 coil | | DO_K4 | RV1 ZU | K4 coil | | DO_K5 | RV2 AUF | K5 coil | | DO_K6 | RV2 ZU | K6 coil | | DO_EVU_SPERRE | Heat pump block | K7 coil | ### Digital Inputs (DI) | DI | Signal | Source | |----|--------|--------| | DI_SAFETY_OK | Safety relay output | Safety relay | | DI_K10_FB | K10 feedback | K10 Hilfskontakt | | DI_K11_FB | K11 feedback | K11 Hilfskontakt | | DI_RK_FAULT | Rückkühler fault | Optional | ### Analog Outputs (AO) | AO | Function | Range | Target | |----|----------|-------|--------| | AO1 | P3 setpoint | 0–10 V | Wilo PICO BMS module | | AO2 | P4 setpoint | 0–10 V | Wilo PICO BMS module | | AO3 | P5 setpoint | 0–10 V | Wilo PICO BMS module | ### Analog Inputs (AI) | AI | Signal | Range | Notes | |----|--------|-------|-------| | AI1 | Temperature Pufferspeicher | (TBD) | 4-20 mA or 0-10 V | | AI2 | Temperature Warmwasser | (TBD) | | ## Wiring Notes - **0–10 V pump cables**: use shielded cable, shield connected to PE at cabinet end only - **Safety circuit**: NC contacts in series for E-Stop, FLOW OK, TEMP MAX - **Contactor feedback**: Hilfskontakt (NC) in series in safety relay feedback loop - **EVU relay K7**: potential-free — verify no voltage is applied to Buderus I1 - **Miner Schuko**: both plugs of each miner routed through its contactor - **PE**: all metal enclosures to PE ## Commissioning Checklist - [ ] Verify Q0 FI/LS trips correctly - [ ] Verify safety relay trips on E-Stop 1 - [ ] Verify safety relay trips on E-Stop 2 - [ ] Verify safety relay trips on FLOW OK open - [ ] Verify safety relay trips on TEMP MAX open - [ ] Verify K10 and K11 de-energize on safety trip - [ ] Verify K7 does not inject voltage into Buderus I1 - [ ] Verify RevPi AO1-AO3 reach correct voltages (0, 5, 10 V) - [ ] Verify P3, P4, P5 respond to 0-10 V setpoint - [ ] Verify RV1 opens/closes via K3/K4 - [ ] Verify RV2 opens/closes via K5/K6 - [ ] Test miner power-up via gRPC API - [ ] Verify Deye RS485 data readable from RPi ## Open Items / Decisions Pending - [ ] Exact current ratings for Miner 1/2 Schuko circuits (S19J ~3200 W = ~14 A each) - [ ] Confirm Pufferspeicher / Warmwasserspeicher sensor types (PT1000 / 4-20mA) - [ ] Confirm RevPi AIO module exact model (AIO hat or separate module) - [ ] Decide if Hand/0/Auto switches needed on valve circuit - [ ] Confirm Rückkühler motor protection (motor starter vs. MCB) - [ ] Smart meter integration protocol - [ ] Battery connection to Deye (type, capacity)